References

Name Of The Contract
DT Metal Recycling Technologies Co. Inc.
Client
Prekons Construction
Started / Completed
01.01.2008 / 01.07.2008
Work Description
10 MVA Installed power,1000kVA Disel Generator, 3 Piece Substation Middle Voltage and Low Voltage. Supply and installation of Weak Current systems.
Name Of The Contract
Darülziyafe Enerji Üretim ve Dağıtım Tesisi / ERBIL
Client
Dosko A.S.
Started / Completed
01.06.2005 / 01.01.2006
Work Description
4 MVA Production Plant, 8 MVA, Distribution Facility , 5 Piece Substation Middle Voltage and Low Voltage. Supply and installation of external lighting systems.
Name Of The Contract
Frito Lay Genel Müdürlük Binasi
Client
Taşdemir Construction A.S.
Started / Completed
01.01.2009 / 01.04.2009
Work Description
Ümraniye / Headquarters building Low Voltage and Weak Current Material supply and installation.
Name Of The Contract
Total Genel Müdürlük Binası
Client
Taşdemir Construction A.S.
Started / Completed
01.04.2008 / 01.11.2008
Work Description
Ümraniye / Headquarters building Low Voltage and Weak Current Materials supply and installation.
Name Of The Contract
3M Çerkezköy Ek Tesisleri
Client
Perge Construction A.S.
Started / Completed
01.02.2007 / 01.07.2007
Work Description
Supply and installation of Low Voltage and weak current systems for additional factory building.
Name Of The Contract
Netaş Enerji Altyapı İlave ve Otomasyon İşleri
Client
Nortel Networks Netaş Telecommunication A.S.
Started / Completed
01.06.2007 / 01.11.2007
Work Description
4 x 770 kVA Disel synchronous generator system and Automation. Supply and installation of Low Voltage Distribution systems.
Name Of The Contract
Clariant Boya Fabrikası Gebze Tesisleri
Client
Taşdemir Construction A.S.
Started / Completed
01.08.2007 / 01.04.2008
Work Description
Gebze Factory Building; Middle Voltage, Low Voltage and Weak Current Systems Materials supply and installation.
For full lists of our references you can see our catalog.(PDF formatında)